IAC logo
IAC Assessment: WI0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1994
Principal Product Electrical contractors
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $5,000,000-$10,000,000
# of Employees 213
Plant Area (Sq.Ft.) 125,952
Annual Production 0 Units
Production Hrs. Annual 3,500
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,558 1,417,937 kWh $0.07
Natural Gas $20,008 4,574 MMBtu $4.37
TOTAL ENERGY COSTS $123,566
RECOMMENDED SAVINGS* $39,034 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,748
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$12,890
Cost:
$42,825
$12,890 236,225 - - - - $12,890
236,225
kWh
-
-
MMBtu
-
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,873
Cost:
$2,800
$1,873 25,791 - - - - $1,873
25,791
kWh
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,555
Cost:
$20,000
$11,492 157,386 $(-2,937) (-672) - - $11,492
157,386
kWh
$(-2,937)
(-672)
MMBtu
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,040
Cost:
$800
$4,040 55,393 - - - - $4,040
55,393
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$287
Cost:
$142
$287 3,810 - - - - $287
3,810
kWh
-
-
MMBtu
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,906
Cost:
$800
- - $2,906 665 - - -
-
kWh
$2,906
665
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,915
Cost:
$6,824
$2,915 39,859 - - - - $2,915
39,859
kWh
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$470
Cost:
$375
$470 6,448 - - - - $470
6,448
kWh
-
-
MMBtu
-
-
$
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,847
Cost:
-
$2,847 - - - - - $2,847
-
kWh
-
-
MMBtu
-
-
$
10: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,643
Cost:
-
- - - - $1,643 - -
-
kWh
-
-
MMBtu
$1,643
-
$
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$437
Cost:
$1,023
- - $437 100 - - -
-
kWh
$437
100
MMBtu
-
-
$
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$171
Cost:
$640
$171 2,345 - - - - $171
2,345
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$39,034
Cost:
$76,229
$36,985 527,257 $406 93 $1,643 - $36,985
527,257
kWh
$406
93
MMBtu
$1,643
-
$
TOTAL IMPLEMENTED Savings:
$10,748
Cost:
$8,647
$5,762 39,859 $3,343 765 $1,643 - $5,762
39,859
kWh
$3,343
765
MMBtu
$1,643
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes