IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

829

matching recommendations
Reset
SIC 3531 Construction Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0028 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,589 $2,500 Not Implemented
OK0374 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $1,003 Implemented
OK0374 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,845 $76,172 Implemented
OK0374 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,244 $0 Implemented
OK0374 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,395 $5,750 Implemented
OK0374 # 05 Y:1992 05 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $225 $0 Not Implemented
OK0374 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,673 $7,440 Not Implemented
UF0027 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $642 Implemented
UF0027 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $4,143 $4,000 Not Implemented
UF0027 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $550 Implemented
UF0027 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,380 $4,766 Implemented
UF0027 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $1,445 $1,200 Implemented
UF0027 # 06 Y:1992 06 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,567 $2,820 Implemented
UF0027 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,518 $49,969 Implemented
UF0027 # 08 Y:1992 08 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,050 $0 Not Implemented
UF0027 # 09 Y:1992 09 1992 RECOVER WASTE HEAT FROM EQUIPMENT $10,881 $17,195 Not Implemented
KU0365 # 01 Y:1992 01 1992 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $13,442 $0 Not Implemented
KU0365 # 02 Y:1992 02 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,266 $31,766 Implemented
KU0365 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,768 $887 Implemented
KU0365 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $873 $870 Not Implemented
KU0365 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,302 $540 Implemented
KU0365 # 06 Y:1992 06 1992 RECOVER WASTE HEAT FROM EQUIPMENT $400 $900 Not Implemented
KU0365 # 07 Y:1992 07 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $250 Implemented
KU0365 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $254 $160 Not Implemented
OK0361 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $307 $403 Not Implemented