Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 3531 | Construction Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0001 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $228 | $0 | Implemented |
MU0001 # 05 Y:2022 | 05 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $7,097 | $16,000 | Not Implemented |
MU0001 # 04 Y:2022 | 04 | 2022 | OPERATE BOILERS ON HIGH FIRE SETTING | $2,532 | $146 | Implemented |
MU0001 # 03 Y:2022 | 03 | 2022 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,694 | $600 | Implemented |
MU0001 # 02 Y:2022 | 02 | 2022 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $2,156 | $3,960 | Implemented |
MU0001 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,472 | $0 | Not Implemented |
UM0285 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $328 | $1,200 | Not Implemented |
UM0285 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $915 | $0 | Implemented |
UM0285 # 05 Y:2005 | 05 | 2005 | ADOPT IN-HOUSE MATERIAL GENERATION | $3,278 | $10,000 | Not Implemented |
UM0285 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,874 | $9,682 | Implemented |
UM0285 # 03 Y:2005 | 03 | 2005 | HEAT WATER WITH EXHAUST HEAT | $7,316 | $18,825 | Not Implemented |
UM0285 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,033 | $750 | Implemented |
UM0285 # 01 Y:2005 | 01 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $21,991 | $0 | Implemented |
IC0080 # 14 Y:2004 | 14 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $258 | $0 | Implemented |
IC0080 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,301 | $900 | Implemented |
IC0080 # 13 Y:2004 | 13 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $49 | Implemented |
IC0080 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $787 | $896 | Implemented |
IC0080 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $413 | $1,540 | Implemented |
IC0080 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,008 | $11,878 | Not Implemented |
IC0080 # 09 Y:2004 | 09 | 2004 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,154 | $10,967 | Not Implemented |
IC0080 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $377 | $1,384 | Not Implemented |
IC0080 # 07 Y:2004 | 07 | 2004 | USE OPTIMUM TEMPERATURE | $62,610 | $35,948 | Implemented |
IC0080 # 06 Y:2004 | 06 | 2004 | USE OPTIMUM TEMPERATURE | $24,757 | $53,496 | Not Implemented |
IC0080 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,354 | $2,640 | Implemented |
IC0080 # 04 Y:2004 | 04 | 2004 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $40,931 | $95,360 | Implemented |