IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

729

matching recommendations
Reset
SIC 3533 Oil And Gas Field Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0945 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $89,490 $1,237,270 n/a
AM0945 # 07 Y:2025 07 2025 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $26,500 $2,650 n/a
AM0945 # 09 Y:2025 09 2025 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,120 $6,600 n/a
AM0945 # 10 Y:2025 10 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,010 $30 n/a
AM0945 # 06 Y:2025 06 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $29,000 $4,680 n/a
AM0945 # 02 Y:2025 02 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,200 $9,349 n/a
AM0945 # 04 Y:2025 04 2025 USE BATTERY STORAGE FOR DEMAND CONTROL $35,800 $170,380 n/a
AM0945 # 05 Y:2025 05 2025 OPTIMIZE PLANT POWER FACTOR $30,475 $47,407 n/a
AM0945 # 08 Y:2025 08 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,560 $681,000 n/a
AM0945 # 11 Y:2025 11 2025 USE SYNTHETIC LUBRICANT $841 $0 n/a
AM0945 # 03 Y:2025 03 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $280,830 $15,000 n/a
LT8379 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,184 $17,100 n/a
LT8379 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,673 $1,193 n/a
LT8379 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $844 $2,073 n/a
LT8379 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,508 $5,600 n/a
WV0630 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $706 $2,559 Implemented
WV0630 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,322 $44,160 Not Implemented
WV0630 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $305 $510 Implemented
WV0630 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $279 Implemented
WV0630 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $371 $911 Implemented
WV0630 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,677 $7,291 Implemented
WV0630 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $405 $1,431 Implemented
OK1068 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,141 $1,208 Implemented
OK1068 # 03 Y:2022 03 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,553 $3,192 Implemented
OK1068 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $830 $0 Not Implemented