IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

714

matching recommendations
Reset
SIC 3533 Oil And Gas Field Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0219 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $38,931 $18,717 Implemented
LL0219 # 03 Y:2005 03 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,345 $4,495 Not Implemented
LL0219 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,142 $60 Implemented
LL0219 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,865 $3,360 Implemented
LL0219 # 06 Y:2005 06 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,000 $465 Not Implemented
LL0219 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,372 $570 Implemented
LL0219 # 08 Y:2005 08 2005 USE PHOTOCELL CONTROLS $1,919 $180 Implemented
LL0219 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,270 $1,581 Implemented
LL0219 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $695 $525 Implemented
LL0219 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $524 $90 Not Implemented
LL0219 # 12 Y:2005 12 2005 RECOVER AND REUSE WASTE MATERIAL $11,259 $18,500 Implemented
LL0219 # 13 Y:2005 13 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $184,840 $1,190 Implemented
LL0219 # 14 Y:2005 14 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,250 $1,486 Implemented
LL0197 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $19,102 $30 Implemented
LL0197 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,439 $30 Not Implemented
LL0197 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,042 $2,920 Implemented
LL0197 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,020 $990 Implemented
LL0197 # 05 Y:2004 05 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $745 $152 Implemented
LL0197 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $245 Implemented
LL0197 # 07 Y:2004 07 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,500 $30 Implemented
OK0678 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,075 $823 Implemented
OK0678 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,817 $3,690 Implemented
OK0678 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,836 $10,835 Implemented
OK0678 # 04 Y:2004 04 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,162 $800 Implemented
OK0678 # 05 Y:2004 05 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,602 $28,350 Not Implemented