IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 3534 Elevators And Moving Stairways
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0230 # 22 Y:2000 22 2000 IMPROVE HANDLING PRACTICES $1,950 $100 Not Implemented
HO0230 # 23 Y:2000 23 2000 MOVE PRODUCT USING MECHANICAL MEANS $3,900 $5,000 Not Implemented
HO0230 # 24 Y:2000 24 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $15,600 $500 Not Implemented
HO0230 # 25 Y:2000 25 2000 REDUCE SCRAP PRODUCTION $600 $5,000 Not Implemented
BD0147 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,585 $10,050 Implemented
BD0147 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,372 $1,200 Implemented
BD0147 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $966 $525 Implemented
BD0147 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $710 $800 Not Implemented
BD0147 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $627 $1,215 Implemented
BD0147 # 06 Y:1999 06 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $631 $800 Not Implemented
BD0147 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $4,368 $7,000 Implemented
OD0056 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $4,344 $701 n/a
OD0056 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $154 $1,365 n/a
OD0056 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $269 $520 n/a
OD0056 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,815 $1,365 n/a
OD0056 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $320 n/a
OD0056 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,826 $8,120 n/a
UD0440 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,448 $0 n/a
UD0440 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,640 $250 n/a
UD0440 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,786 $3,000 n/a
UD0440 # 04 Y:1994 04 1994 ADD AREA LIGHTING SWITCHES $2,496 $200 n/a
UD0440 # 05 Y:1994 05 1994 ADD AREA LIGHTING SWITCHES $1,454 $200 n/a
BD0008 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,972 $4,883 Implemented
BD0008 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $855 Implemented
BD0008 # 03 Y:1994 03 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,592 $700 Not Implemented