IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0422 # 12 Y:2016 12 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $55,094 $185,000 Not Implemented
LE0422 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $6,250 Not Implemented
LE0422 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $713 $2,175 Not Implemented
LE0422 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,319 $3,000 Implemented
LE0422 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $990 $1,500 Not Implemented
LE0422 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,924 $3,037 Not Implemented
LE0422 # 06 Y:2016 06 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,304 $1,350 Implemented
LE0422 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,151 $1,000 Implemented
LE0422 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,358 $415 Not Implemented
LE0422 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $3,645 $510 Not Implemented
LE0422 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,594 $218 Not Implemented
LE0422 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,631 $2,000 Not Implemented
SU0293 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,028 $0 Not Implemented
SU0293 # 12 Y:2010 12 2010 UPGRADE OBSOLETE EQUIPMENT $2,203 $19,090 Not Implemented
SU0293 # 11 Y:2010 11 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,796 $150,000 Not Implemented
SU0293 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $609 $2,721 Not Implemented
SU0293 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $337 $898 Not Implemented
SU0293 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $270 $291 Not Implemented
SU0293 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,954 $0 Not Implemented
SU0293 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,252 $0 Not Implemented
SU0293 # 05 Y:2010 05 2010 $2,435 $0 Not Implemented
SU0293 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,692 $0 Not Implemented
SU0293 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,942 $0 Not Implemented
SU0293 # 03 Y:2010 03 2010 USE SYNTHETIC LUBRICANT $3,669 $0 Not Implemented
WV0356 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,825 $33,400 Not Implemented