Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT0052 # 02 Y:1986 | 02 | 1986 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,370 | $1,220 | Not Implemented |
LT0052 # 06 Y:1986 | 06 | 1986 | INSTALL SET-BACK TIMERS | $1,865 | $0 | Implemented |
LT0052 # 04 Y:1986 | 04 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,659 | $1,632 | Implemented |
LT0052 # 07 Y:1986 | 07 | 1986 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $556 | $1,470 | Not Implemented |
LT0052 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,795 | $4,990 | Implemented |
LT0052 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,660 | $1,476 | Implemented |
LT0052 # 05 Y:1986 | 05 | 1986 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $735 | $770 | Not Implemented |
KU0202 # 01 Y:1986 | 01 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $17,707 | $200 | Implemented |
KU0202 # 11 Y:1986 | 11 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $213 | $0 | Not Implemented |
KU0202 # 10 Y:1986 | 10 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $210 | $50 | Implemented |
KU0202 # 09 Y:1986 | 09 | 1986 | IMPROVE LUBRICATION PRACTICES | $284 | $300 | Implemented |
KU0202 # 08 Y:1986 | 08 | 1986 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $308 | $0 | Implemented |
KU0202 # 07 Y:1986 | 07 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $365 | $0 | Implemented |
KU0202 # 06 Y:1986 | 06 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $486 | $400 | Implemented |
KU0202 # 05 Y:1986 | 05 | 1986 | IMPROVE LUBRICATION PRACTICES | $568 | $100 | Implemented |
KU0202 # 04 Y:1986 | 04 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $702 | $1,100 | Not Implemented |
KU0202 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,519 | $3,765 | Implemented |
KU0202 # 02 Y:1986 | 02 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $472 | $0 | Implemented |
KU0200 # 07 Y:1986 | 07 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $116 | $150 | Implemented |
KU0200 # 06 Y:1986 | 06 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $216 | $0 | Not Implemented |
KU0200 # 05 Y:1986 | 05 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $198 | $0 | Implemented |
KU0200 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $473 | $0 | Implemented |
KU0200 # 03 Y:1986 | 03 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,694 | $0 | Implemented |
KU0200 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $1,000 | Implemented |
KU0200 # 01 Y:1986 | 01 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,229 | $14,500 | Implemented |