Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0170 # 02 Y:2000 02 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,709 $95 Not Implemented
NV0170 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,657 $360 Implemented
NV0170 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $8,109 $14,542 Implemented
NV0170 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $985 $100 Implemented
AS0289 # 04 Y:2000 04 2000 USE SYNTHETIC LUBRICANT $1,048 $694 Implemented
AS0289 # 02 Y:2000 02 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,081 $9,000 Implemented
AS0289 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $387 $60 Not Implemented
AS0289 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,898 $18,153 Implemented
AS0289 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $481 $221 Implemented
AS0289 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $301 $380 Not Implemented
AS0289 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,126 $140 Implemented
AS0289 # 08 Y:2000 08 2000 $29,000 $650 Implemented
NC0199 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,374 $7,490 Implemented
NC0199 # 07 Y:2000 07 2000 INSTALL COMMON HEADER ON COMPRESSORS $26,946 $118,000 Not Implemented
NC0199 # 06 Y:2000 06 2000 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,140 $0 Implemented
NC0199 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,352 $210 Implemented
NC0199 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $351 $102 Not Implemented
NC0199 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,516 $1,070 Not Implemented
NC0199 # 01 Y:2000 01 2000 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,845 $777 Not Implemented
BD0167 # 06 Y:2000 06 2000 $273,586 $375,000 n/a
BD0167 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $924 $3,400 n/a
BD0167 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $500 n/a
BD0167 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $328 $1,080 n/a
BD0167 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $529 $600 n/a
BD0167 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $776 $1,750 n/a