Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
424
matching recommendationsSIC | 3545 | Machine Tool Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0227 # 12 Y:2023 | 12 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $53 | $333 | Implemented |
UU0227 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,169 | $10,776 | Implemented |
UU0227 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,564 | $7,061 | Implemented |
UU0227 # 10 Y:2023 | 10 | 2023 | MINIMIZE WATER USAGE | $2,457 | $2,652 | Implemented |
UU0227 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,237 | $6,000 | Implemented |
UU0227 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,325 | $78,840 | Implemented |
UU0227 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $4,289 | $9,282 | Implemented |
UU0227 # 11 Y:2023 | 11 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,160 | $2,000 | Not Implemented |
UU0227 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,358 | $13,337 | Implemented |
UU0227 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,399 | $40,790 | Not Implemented |
SD0630 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,850 | $9,294 | Implemented |
SD0630 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $664 | $1,500 | Implemented |
SD0630 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,049 | $13,269 | Implemented |
SD0630 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,064 | $7,542 | Implemented |
SD0630 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $598 | $500 | Implemented |
SD0630 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,881 | $57,222 | Implemented |
SD0630 # 08 Y:2023 | 08 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,832 | $1,080 | Implemented |
SD0630 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,113 | $3,606 | Implemented |
MS0399 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,456 | $31,953 | Not Implemented |
MS0399 # 03 Y:2022 | 03 | 2022 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $8,256 | $0 | Not Implemented |
MS0399 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $4,013 | $6,244 | Not Implemented |
NC0644 # 01 Y:2019 | 01 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $28,909 | $65,575 | Implemented |
NC0644 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,841 | $25,826 | Implemented |
NC0644 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $23,191 | $30,000 | Implemented |
NC0644 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,387 | $50,000 | Not Implemented |