IAC logo
IAC Assessment: NC0644
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0644
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Tools and display packs plus large distribution center
NAICS 333517 - Machine Tool Manufacturing
SIC 3545 - Machine Tool Accessories
Sales $100,000,000-$500,000,000
# of Employees 470
Plant Area (Sq.Ft.) 500,000
Annual Production 1,300,000 Pieces
Production Hrs. Annual 5,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $490,768 9,760,000 kWh $0.05
Electricity Demand $217,313 16,768 kW-months/year $12.96
Natural Gas $47,281 6,519 MMBtu $7.25
TOTAL ENERGY COSTS $755,362
RECOMMENDED SAVINGS* $82,767 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$28,909
Cost:
$65,575
$21,366 424,772 $7,543 582 $21,366
424,772
kWh
$7,543
582
kW-months/year
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$23,191
Cost:
$30,000
$11,661 231,831 $11,530 890 $11,661
231,831
kWh
$11,530
890
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,841
Cost:
$25,826
$6,894 137,051 $3,947 305 $6,894
137,051
kWh
$3,947
305
kW-months/year
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,639
Cost:
-
$1,639 32,585 - - $1,639
32,585
kWh
-
-
kW-months/year
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,800
Cost:
-
- - $5,800 448 -
-
kWh
$5,800
448
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,387
Cost:
$50,000
$7,877 156,600 $4,510 348 $7,877
156,600
kWh
$4,510
348
kW-months/year
TOTAL RECOMMENDED Savings:
$82,767
Cost:
$171,401
$49,437 982,839 $33,330 2,573 $49,437
982,839
kWh
$33,330
2,573
kW-months/year
TOTAL IMPLEMENTED Savings:
$62,941
Cost:
$121,401
$39,921 793,654 $23,020 1,777 $39,921
793,654
kWh
$23,020
1,777
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand