Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
106
matching recommendationsSIC | 3546 | Power-driven Handtools |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0150 # 05 Y:1999 | 05 | 1999 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $35,216 | $50,000 | Not Implemented |
NC0144 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,673 | $14,934 | Not Implemented |
NC0144 # 02 Y:1998 | 02 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,664 | $1,000 | Implemented |
NC0144 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,696 | $12,000 | Not Implemented |
NC0144 # 04 Y:1998 | 04 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,617 | $4,731 | Implemented |
NC0144 # 05 Y:1998 | 05 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $113 | $200 | Implemented |
NC0144 # 06 Y:1998 | 06 | 1998 | METER WASTE WATER | $1,464 | $200 | Implemented |
NC0144 # 07 Y:1998 | 07 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $5,550 | $2,700 | Implemented |
NC0144 # 08 Y:1998 | 08 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,325 | $12,000 | Not Implemented |
WI0311 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,098 | $40,000 | Not Implemented |
WI0311 # 02 Y:1998 | 02 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,699 | $5,024 | Not Implemented |
WI0311 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,492 | $7,504 | Implemented |
WI0311 # 04 Y:1998 | 04 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $3,414 | $7,000 | Not Implemented |
WI0311 # 05 Y:1998 | 05 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,196 | $0 | Not Implemented |
WI0311 # 06 Y:1998 | 06 | 1998 | INSULATE BARE EQUIPMENT | $548 | $532 | Not Implemented |
MA0380 # 01 Y:1996 | 01 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,018 | $5,000 | Implemented |
MA0380 # 02 Y:1996 | 02 | 1996 | REPOSITION OVEN WALLS TO REDUCE HEATED SPACE | $1,037 | $360 | Not Implemented |
MA0380 # 03 Y:1996 | 03 | 1996 | INSULATE BARE EQUIPMENT | $686 | $1,040 | Not Implemented |
MA0380 # 04 Y:1996 | 04 | 1996 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $616 | $885 | Implemented |
MA0380 # 05 Y:1996 | 05 | 1996 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $503 | $229 | Not Implemented |
OD0005 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $943 | $336 | Implemented |
OD0005 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $692 | $302 | Not Implemented |
OD0005 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,191 | $16,710 | Not Implemented |
OD0005 # 04 Y:1994 | 04 | 1994 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $20,090 | $3,677 | Not Implemented |
OD0005 # 05 Y:1994 | 05 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,595 | $5,698 | Not Implemented |