IAC logo
IAC Assessment: OD0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1994
Principal Product chain saws & outdoor power equipment
NAICS n/a
SIC 3546 - Power-driven Handtools
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 500,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 8,232
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $691,086 13,143,025 kWh $0.05
Natural Gas $57,834 9,785 MMBtu $5.91
TOTAL ENERGY COSTS $748,920
RECOMMENDED SAVINGS* $41,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,122
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$943
Cost:
$336
$943 18,171 - - $943
18,171
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$692
Cost:
$302
$692 13,189 - - $692
13,189
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,191
Cost:
$16,710
$8,191 155,920 - - $8,191
155,920
kWh
-
-
MMBtu
04: 2.2525 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA Savings:
$20,090
Cost:
$3,677
$20,090 381,887 - - $20,090
381,887
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,595
Cost:
$5,698
$4,595 92,907 - - $4,595
92,907
kWh
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$179
Cost:
$97
$179 3,517 - - $179
3,517
kWh
-
-
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,793
Cost:
$5,589
$8,737 166,178 $(-3,944) (-664) $8,737
166,178
kWh
$(-3,944)
(-664)
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,047
Cost:
$3,810
$2,047 38,980 - - $2,047
38,980
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$41,530
Cost:
$36,219
$45,474 870,749 $(-3,944) (-664) $45,474
870,749
kWh
$(-3,944)
(-664)
MMBtu
TOTAL IMPLEMENTED Savings:
$1,122
Cost:
$433
$1,122 21,688 - - $1,122
21,688
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas