Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,584
matching recommendationsSIC | 355 | Special Industry Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0062 # 01 Y:2024 | 01 | 2024 | COVER OPEN TANKS | $10,932 | $2,523 | n/a |
MU0062 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,520 | $98 | n/a |
MU0062 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,416 | $780 | n/a |
MU0062 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,453 | $260 | n/a |
MU0062 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,013 | $1,482 | n/a |
MU0062 # 05 Y:2024 | 05 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $216 | $0 | n/a |
MU0062 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $235 | $530 | n/a |
GT0985 # 02 Y:2024 | 02 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $164 | $90 | n/a |
GT0985 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,752 | $438,980 | n/a |
GT0985 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $3,635 | $4,650 | n/a |
GT0985 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $111 | $200 | n/a |
GT0985 # 09 Y:2024 | 09 | 2024 | OPTIMIZE PLANT POWER FACTOR | $563 | $3,003 | n/a |
GT0985 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $33,932 | $2,100 | n/a |
GT0985 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $182 | $200 | n/a |
GT0985 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $5,863 | n/a |
GT0985 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,117 | $1,850 | n/a |
UF0617 # 06 Y:2024 | 06 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $890,327 | $117,000 | Not Implemented |
UF0617 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,700 | $322,608 | Not Implemented |
UF0617 # 08 Y:2024 | 08 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $904 | $1,752 | Implemented |
UF0617 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,599 | $49,000 | Not Implemented |
UF0617 # 07 Y:2024 | 07 | 2024 | AUTOMATE FINISHING PROCESS | $74,880 | $100,000 | Implemented |
UF0617 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,230 | $5,280 | Implemented |
UF0617 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,015 | $12,416 | Implemented |
UF0617 # 05 Y:2024 | 05 | 2024 | REDUCE GLAZED AREAS IN BUILDINGS | $1,046 | $1,720 | Implemented |
OR0787 # 02 Y:2024 | 02 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,862 | $0 | Implemented |