IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0286 # 02 Y:2020 02 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,624 $9,088 Implemented
MZ0286 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,970 $2,000 Implemented
MZ0276 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $367 $120 Implemented
MZ0276 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,641 $180 Implemented
MZ0276 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $249 $1,040 Implemented
MZ0276 # 04 Y:2019 04 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $44,070 $184,040 Implemented
MZ0276 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $191 $390 Implemented
MZ0276 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $60 Implemented
MZ0207 # 05 Y:2015 05 2015 ELIMINATE/REDUCE AN OPERATION $149 $0 Implemented
MZ0207 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $3,430 Implemented
MZ0207 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,485 $27,300 Implemented
MZ0207 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,538 $880 Implemented
MZ0002 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,930 $40,700 Implemented
IA0347 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,623 $920 Implemented
IA0347 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,243 $1,090 Implemented
IA0347 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,608 $2,591 Implemented
IA0347 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,911 $1,820 Implemented
IA0347 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $929 $457 Implemented
IA0347 # 07 Y:2004 07 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,967 $148 Implemented
IA0347 # 09 Y:2004 09 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $244 $0 Implemented
MO0135 # 08 Y:1994 08 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $77 $150 Implemented
MO0135 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $240 Implemented
MO0135 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,447 $4,559 Implemented
MO0135 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,831 $18,231 Implemented
MO0135 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,507 $612 Implemented