IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,577

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0126 # 07 Y:2007 07 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $59,636 $0 Implemented
AS0431 # 01 Y:2006 01 2006 USE SOLAR HEAT TO HEAT WATER $1,728 $8,800 n/a
AS0431 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,413 $1,500 n/a
AS0431 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $529 $1,500 n/a
AS0431 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $401 $1,500 n/a
AS0431 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $370 $1,000 n/a
UU0107 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $520 $435 Not Implemented
UU0107 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $950 $18 Not Implemented
UU0107 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,590 $2,085 Not Implemented
UU0107 # 04 Y:2006 04 2006 REPLACE BOILER $1,090 $800 Not Implemented
UU0107 # 05 Y:2006 05 2006 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,470 $8,820 Not Implemented
UU0107 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $1,690 $1,860 Not Implemented
SU0233 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,203 $0 Implemented
SU0233 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,395 $0 Not Implemented
SU0233 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $2,163 $0 Implemented
SU0233 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,001 $0 Implemented
SU0233 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,928 $542 Not Implemented
SU0233 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,182 $1,050 Implemented
SU0233 # 07 Y:2006 07 2006 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $14,472 $9,451 Not Implemented
SU0233 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,003 $7,100 Not Implemented
SU0233 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,954 $81,620 Not Implemented
SU0233 # 10 Y:2006 10 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $392 $687 Not Implemented
SU0233 # 11 Y:2006 11 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,021 $11,554 Not Implemented
SU0232 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,030 $0 Implemented
SU0232 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,876 $0 Implemented