IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

760

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0351 # 02 Y:1996 02 1996 AIR CONDITION ONLY SPACE NECESSARY $10,096 $26,690 Not Implemented
MA0351 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,105 $2,750 Implemented
MA0351 # 04 Y:1996 04 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,400 $2,200 Not Implemented
MA0351 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $1,777 $770 Implemented
SF0073 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $760 $2,712 Implemented
SF0073 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,344 $77,930 Implemented
SF0073 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $216 $360 Implemented
SF0073 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,574 $6,500 Implemented
SF0073 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,035 $3,560 Not Implemented
SF0073 # 06 Y:1995 06 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,080 $2,950 Not Implemented
SF0073 # 07 Y:1995 07 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $2,735 $1,768 Not Implemented
SF0073 # 08 Y:1995 08 1995 OPTIMIZE PLANT POWER FACTOR $2,095 $2,297 Not Implemented
SF0073 # 09 Y:1995 09 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,400 $0 Implemented
SF0073 # 10 Y:1995 10 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $25,718 $644 Not Implemented
KG0029 # 01 Y:1995 01 1995 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $27,964 $682 Implemented
KG0029 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,307 $3,000 Implemented
KG0029 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $966 $353 Implemented
KG0029 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,500 $13,480 Implemented
KG0029 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $1,640 $300 Implemented
KG0029 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $780 $600 Not Implemented
KG0029 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $160 $300 Not Implemented
BD0021 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,801 $5,910 Not Implemented
BD0021 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $286 $250 Not Implemented
BD0021 # 03 Y:1995 03 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,524 $20 Implemented
BD0021 # 04 Y:1995 04 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $52 $20 Not Implemented