Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,477
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0160 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $280 | $200 | Implemented |
UD0160 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,689 | $0 | Implemented |
UD0160 # 06 Y:1985 | 06 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,825 | $551 | Implemented |
UD0160 # 07 Y:1985 | 07 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,401 | $7,500 | Implemented |
ST0012 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,341 | $40 | Implemented |
ST0012 # 02 Y:1985 | 02 | 1985 | REDUCE VENTILATION AIR | $935 | $1,644 | Implemented |
ST0012 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $698 | $537 | Implemented |
ST0012 # 06 Y:1985 | 06 | 1985 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $1,235 | $0 | Implemented |
ST0012 # 07 Y:1985 | 07 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $326 | $0 | Implemented |
ST0012 # 08 Y:1985 | 08 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,921 | $80 | Implemented |
ST0012 # 10 Y:1985 | 10 | 1985 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $166 | $80 | Implemented |
MA0013 # 01 Y:1985 | 01 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $949 | $171 | Implemented |
MA0013 # 02 Y:1985 | 02 | 1985 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,976 | $8,800 | Implemented |
MA0013 # 04 Y:1985 | 04 | 1985 | DISCONNECT BALLASTS | $1,543 | $900 | Implemented |
TN0228 # 04 Y:1984 | 04 | 1984 | ISOLATE HOT OR COLD EQUIPMENT | $568 | $108 | Implemented |
KU0144 # 02 Y:1984 | 02 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,395 | $4,000 | Implemented |
KU0144 # 03 Y:1984 | 03 | 1984 | IMPROVE LUBRICATION PRACTICES | $1,597 | $0 | Implemented |
KU0144 # 05 Y:1984 | 05 | 1984 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,578 | $0 | Implemented |
KU0144 # 07 Y:1984 | 07 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,279 | $39 | Implemented |
KU0144 # 08 Y:1984 | 08 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $160 | $0 | Implemented |
KU0144 # 09 Y:1984 | 09 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,039 | $500 | Implemented |
KU0144 # 10 Y:1984 | 10 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $753 | $400 | Implemented |
UD0132 # 02 Y:1984 | 02 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,478 | $500 | Implemented |
UD0132 # 03 Y:1984 | 03 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $698 | $1,436 | Implemented |
UD0132 # 04 Y:1984 | 04 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $823 | $0 | Implemented |