IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0298 # 09 Y:1994 09 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,095 $12,313 Not Implemented
MA0298 # 10 Y:1994 10 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $779 $783 Implemented
MA0298 # 11 Y:1994 11 1994 DISCONNECT BALLASTS $677 $0 Implemented
MA0298 # 12 Y:1994 12 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $409 $988 Implemented
WV0023 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,806 $15,603 Implemented
WV0023 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,312 $29,510 Implemented
WV0023 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,240 $452 Not Implemented
WV0023 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,526 $1,000 Not Implemented
WV0023 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $325 $116 Not Implemented
WV0023 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,432 $0 Implemented
WV0023 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,359 $200 Implemented
AM0203 # 01 Y:1994 01 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $34,315 $0 Not Implemented
AM0203 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,650 $0 Implemented
AM0203 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $370 Implemented
AM0203 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $400 $0 Not Implemented
MA0292 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,627 $0 Not Implemented
MA0292 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $9,713 $22,395 Not Implemented
MA0292 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,732 $20,860 Not Implemented
MA0292 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,154 $0 Implemented
MA0292 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,012 $1,062 Implemented
MA0292 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $939 $100 Implemented
MA0292 # 07 Y:1994 07 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $503 $300 Implemented
MA0292 # 08 Y:1994 08 1994 INSTALL OCCUPANCY SENSORS $400 $416 Not Implemented
MA0292 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $327 $961 Implemented
MO0106 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,914 $1,064 Implemented