IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,252

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0151 # 03 Y:1989 03 1989 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $4,308 $243 Not Implemented
MA0151 # 04 Y:1989 04 1989 BURN A LESS EXPENSIVE GRADE OF FUEL $12,509 $15,150 Implemented
MA0151 # 05 Y:1989 05 1989 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,022 $593 Implemented
MA0151 # 06 Y:1989 06 1989 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $1,093 $592 Not Implemented
MA0151 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,050 $3,150 Not Implemented
UD0291 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,548 $6,000 Not Implemented
UD0291 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,832 $15,000 Implemented
UD0291 # 03 Y:1989 03 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $851 $500 Implemented
UD0291 # 04 Y:1989 04 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,237 $4,000 Not Implemented
UD0291 # 05 Y:1989 05 1989 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,866 $2,000 Implemented
RU0050 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $221 $159 Not Implemented
RU0050 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $0 Implemented
RU0050 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $173 $600 Not Implemented
RU0050 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $272 $0 Implemented
RU0050 # 05 Y:1989 05 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,484 $1,000 Not Implemented
RU0050 # 06 Y:1989 06 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,367 $1,440 Not Implemented
MA0147 # 01 Y:1989 01 1989 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $9,019 $15,500 Not Implemented
MA0147 # 02 Y:1989 02 1989 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $182,460 $350,000 Not Implemented
MA0147 # 03 Y:1989 03 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $144 $41 Implemented
MA0147 # 04 Y:1989 04 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,136 $483 Not Implemented
MA0147 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $446 $331 Implemented
MA0147 # 06 Y:1989 06 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,080 $0 Implemented
RU0048 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $484 $159 Not Implemented
RU0048 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,693 $17,613 Implemented
RU0048 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,252 $0 Implemented