IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0012 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $698 $537 Implemented
ST0012 # 06 Y:1985 06 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $1,235 $0 Implemented
ST0012 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $326 $0 Implemented
ST0012 # 08 Y:1985 08 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,921 $80 Implemented
ST0012 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $1,337 Not Implemented
ST0012 # 10 Y:1985 10 1985 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $166 $80 Implemented
MA0013 # 01 Y:1985 01 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $949 $171 Implemented
MA0013 # 02 Y:1985 02 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,976 $8,800 Implemented
MA0013 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,897 $1,850 Not Implemented
MA0013 # 04 Y:1985 04 1985 DISCONNECT BALLASTS $1,543 $900 Implemented
TN0228 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,347 $0 Not Implemented
TN0228 # 02 Y:1984 02 1984 COVER OPEN TANKS $392 $500 Not Implemented
TN0228 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $197 $201 Not Implemented
TN0228 # 04 Y:1984 04 1984 ISOLATE HOT OR COLD EQUIPMENT $568 $108 Implemented
TN0228 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $456 $87 Not Implemented
KU0144 # 01 Y:1984 01 1984 REDUCE VENTILATION AIR $11,229 $0 Not Implemented
KU0144 # 02 Y:1984 02 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,395 $4,000 Implemented
KU0144 # 03 Y:1984 03 1984 IMPROVE LUBRICATION PRACTICES $1,597 $0 Implemented
KU0144 # 04 Y:1984 04 1984 INSTALL AUTOMATIC STACK DAMPER $2,157 $1,900 Not Implemented
KU0144 # 05 Y:1984 05 1984 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,578 $0 Implemented
KU0144 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,279 $39 Implemented
KU0144 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $160 $0 Implemented
KU0144 # 09 Y:1984 09 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,039 $500 Implemented
KU0144 # 10 Y:1984 10 1984 RECOVER WASTE HEAT FROM EQUIPMENT $753 $400 Implemented
KU0144 # 11 Y:1984 11 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140 $200 Not Implemented