IAC Assessment: OK0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1986
Principal Product PUMPS & MOTORS
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 1,500 Pieces
Production Hrs. Annual 5,100
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $353,724 6,514,947 kWh $0.05
Natural Gas $77,915 21,459 MMBtu $3.63
TOTAL ENERGY COSTS $431,639
RECOMMENDED SAVINGS* $23,397 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,312
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,989
Cost:
$500
$1,989 43,669 - - - - $1,989
43,669
kWh
-
-
MMBtu
-
-
$
02: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$2,085
Cost:
$214
$372 12,603 $1,713 463 - - $372
12,603
kWh
$1,713
463
MMBtu
-
-
$
03: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$2,520
Cost:
$3,000
- - $2,520 681 - - -
-
kWh
$2,520
681
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,902
Cost:
-
$12,902 - - - - - $12,902
-
kWh
-
-
MMBtu
-
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,289
Cost:
$1,200
$1,289 - - - - - $1,289
-
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$582
Cost:
-
$682 22,860 - - $(-100) - $682
22,860
kWh
-
-
MMBtu
$(-100)
-
$
07: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$2,030
Cost:
$1,200
$2,030 41,325 - - - - $2,030
41,325
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,397
Cost:
$6,114
$19,264 120,457 $4,233 1,144 $(-100) - $19,264
120,457
kWh
$4,233
1,144
MMBtu
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$21,312
Cost:
$5,900
$18,892 107,854 $2,520 681 $(-100) - $18,892
107,854
kWh
$2,520
681
MMBtu
$(-100)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes