Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,257
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0272 # 09 Y:2019 | 09 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $25,031 | $126,000 | Not Implemented |
OK1009 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,453 | $37,361 | Not Implemented |
OK1009 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,469 | $833 | Implemented |
OK1009 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,224 | $0 | Not Implemented |
OK1009 # 04 Y:2019 | 04 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,915 | $0 | Implemented |
OK1009 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $365 | $1,365 | Not Implemented |
OK1009 # 06 Y:2019 | 06 | 2019 | PAY UTILITY BILLS ON TIME | $371 | $0 | Not Implemented |
OK1009 # 07 Y:2019 | 07 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $8,182 | $1,430 | Implemented |
IC0215 # 01 Y:2019 | 01 | 2019 | REPLACE BOILER | $18,625 | $2,250 | Not Implemented |
IC0215 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $386 | $2,006 | Not Implemented |
IC0215 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,317 | $10,297 | Not Implemented |
IC0215 # 04 Y:2019 | 04 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,090 | $0 | Not Implemented |
TT0220 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,872 | $88,116 | Implemented |
TT0220 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $34,064 | $64,000 | Not Implemented |
TT0220 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,304 | $80 | Implemented |
TT0220 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,995 | $6,300 | Implemented |
TT0220 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,534 | $60 | Implemented |
TT0220 # 06 Y:2019 | 06 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,115 | $15,000 | Not Implemented |
TT0220 # 07 Y:2019 | 07 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,624 | $2,150 | Not Implemented |
TT0220 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,527 | $945 | Not Implemented |
TT0220 # 09 Y:2019 | 09 | 2019 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $340 | $60 | Implemented |
MI0347 # 01 Y:2019 | 01 | 2019 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $8,536 | $4,314 | Not Implemented |
MI0347 # 02 Y:2019 | 02 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,058 | $30,007 | Not Implemented |
MI0347 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,740 | $2,923 | Implemented |
MI0347 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,404 | $3,100 | Implemented |