Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Kentucky |
---|---|
Assessment Year | 2019 |
Principal Product | HVLS Fans and LED fixtures |
NAICS | 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564 - Blowers And Fans |
Sales | <$500,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 500,000 Units |
Production Hrs. Annual | 4,125 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,461 | 2,384,960 | kWh | $0.04 |
Electricity Demand | $120,952 | 6,495 | kW-months/year | $18.62 |
Electricity Fees | $2,405 | - | $ | - |
Natural Gas | $30,276 | 3,383 | MMBtu | $8.95 |
TOTAL ENERGY COSTS | $254,094 | |||
RECOMMENDED SAVINGS* | $54,816 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $483 Cost: $1,100 |
$483 | 6,744 | - | - | - | - | - | - |
$483 6,744 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,725 Cost: - |
$1,508 | 21,566 | $217 | 10 | - | - | - | - |
$1,508 21,566 kWh |
$217 10 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,355 Cost: $2,630 |
$3,355 | 98,669 | - | - | - | - | - | - |
$3,355 98,669 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,341 Cost: $2,275 |
$722 | 21,234 | $619 | 29 | - | - | - | - |
$722 21,234 kWh |
$619 29 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $288 Cost: $1,045 |
$288 | 8,484 | - | - | - | - | - | - |
$288 8,484 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,304 Cost: $660 |
- | - | - | - | - | - | $1,304 | 148 |
- - kWh |
- - kW-months/year |
- - $ |
$1,304 148 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,766 Cost: - |
$1,611 | 39,535 | - | - | - | - | $1,155 | 128 |
$1,611 39,535 kWh |
- - kW-months/year |
- - $ |
$1,155 128 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $3,392 Cost: - |
$1,531 | 31,854 | - | - | - | - | $1,861 | 208 |
$1,531 31,854 kWh |
- - kW-months/year |
- - $ |
$1,861 208 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $8,769 Cost: $4,160 |
$585 | 17,200 | $2,149 | 100 | - | - | $6,035 | 685 |
$585 17,200 kWh |
$2,149 100 kW-months/year |
- - $ |
$6,035 685 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $107 Cost: $223 |
$107 | 3,145 | - | - | - | - | - | - |
$107 3,145 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,742 Cost: - |
$2,742 | 80,644 | - | - | - | - | - | - |
$2,742 80,644 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,165 Cost: $48,242 |
$4,627 | 131,080 | $9,538 | 442 | - | - | - | - |
$4,627 131,080 kWh |
$9,538 442 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $2,056 Cost: - |
$2,056 | 18,193 | - | - | - | - | - | - |
$2,056 18,193 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $36 Cost: $36 |
$19 | 569 | $17 | 1 | - | - | - | - |
$19 569 kWh |
$17 1 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $12,287 Cost: - |
- | - | - | - | $12,287 | - | - | - |
- - kWh |
- - kW-months/year |
$12,287 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $54,816 Cost: $60,371 |
$19,634 | 478,917 | $12,540 | 582 | $12,287 | - | $10,355 | 1,169 | $19,634 478,917 kWh |
$12,540 582 kW-months/year |
$12,287 - $ |
$10,355 1,169 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |