Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0347 # 06 Y:2019 | 06 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,152 | $10,680 | Not Implemented |
MI0347 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,680 | $2,020 | Not Implemented |
MI0347 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,489 | $5,529 | Implemented |
MI0347 # 09 Y:2019 | 09 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,469 | $1,640 | Not Implemented |
MI0347 # 10 Y:2019 | 10 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,492 | $7,000 | Not Implemented |
MI0347 # 12 Y:2019 | 12 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $547 | $480 | Implemented |
GT0915 # 01 Y:2018 | 01 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,293 | $100 | Implemented |
GT0915 # 04 Y:2018 | 04 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,802 | $531,855 | Not Implemented |
GT0915 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,057 | $13,064 | Implemented |
GT0915 # 02 Y:2018 | 02 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,909 | $580 | Implemented |
UF0207 # 07 Y:1998 | 07 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,133 | $3,240 | Not Implemented |
UF0207 # 11 Y:1998 | 11 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $4,680 | $5,500 | Not Implemented |
UF0207 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,587 | $0 | Implemented |
UF0207 # 10 Y:1998 | 10 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $31,783 | $5,000 | Implemented |
UF0207 # 08 Y:1998 | 08 | 1998 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $14,389 | $18,400 | Not Implemented |
UF0207 # 09 Y:1998 | 09 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,662 | $0 | Implemented |
UF0207 # 02 Y:1998 | 02 | 1998 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,168 | $648 | Not Implemented |
UF0207 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,217 | $1,396 | Not Implemented |
UF0207 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,914 | $1,700 | Implemented |
UF0207 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,651 | $1,688 | Not Implemented |
UF0207 # 01 Y:1998 | 01 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,410 | $0 | Implemented |
UF0194 # 05 Y:1998 | 05 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $660 | $1,896 | Implemented |
UF0194 # 06 Y:1998 | 06 | 1998 | INSTALL OCCUPANCY SENSORS | $340 | $832 | Not Implemented |
UF0194 # 07 Y:1998 | 07 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $144 | $400 | Implemented |
UF0194 # 08 Y:1998 | 08 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $781 | $850 | Implemented |