IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0295 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $646 $2,610 Not Implemented
TT0295 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,010 $1,360 Not Implemented
TT0295 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $377 $150 Not Implemented
TT0295 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,115 $20,000 Not Implemented
TT0295 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,897 $44,225 Not Implemented
TT0295 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,448 $2,000 Not Implemented
TT0220 # 07 Y:2019 07 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,624 $2,150 Not Implemented
TT0220 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,995 $6,300 Implemented
TT0220 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $60 Implemented
TT0220 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,304 $80 Implemented
TT0220 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $34,064 $64,000 Not Implemented
TT0220 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,872 $88,116 Implemented
TT0220 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,527 $945 Not Implemented
TT0220 # 09 Y:2019 09 2019 CHECK FOR ACCURACY OF UTILITY / POWER METERS $340 $60 Implemented
TT0220 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $5,115 $15,000 Not Implemented
TT0089 # 02 Y:2012 02 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,031 $89,180 Not Implemented
TT0089 # 04 Y:2012 04 2012 INSTALL SKYLIGHTS $7,188 $96,000 Not Implemented
TT0089 # 01 Y:2012 01 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,022 $6,293 Not Implemented
TT0089 # 03 Y:2012 03 2012 USE SOLAR HEAT FOR HEAT $25,369 $109,680 Not Implemented
TT0073 # 01 Y:2011 01 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,566 $9,650 Implemented
TT0059 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,600 $38,200 Implemented
TT0059 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,900 $1,800 Implemented
TT0059 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,100 $205,600 Implemented
TT0059 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,500 $7,500 Not Implemented
TT0059 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $4,900 Not Implemented