IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0114 # 09 Y:1998 09 1998 $5,289 $4,395 Implemented
BD0114 # 08 Y:1998 08 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,921 $1,300 Not Implemented
BD0114 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,147 $250 Implemented
BD0114 # 06 Y:1998 06 1998 FILTER AND REUSE HYDRAULIC OIL $4,256 $1,125 Not Implemented
BD0114 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $281 $200 Not Implemented
BD0114 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $2,257 Implemented
BD0114 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,281 $15,250 Implemented
BD0114 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $5,471 $2,025 Not Implemented
BD0114 # 03 Y:1998 03 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,053 $5,000 Not Implemented
BD0041 # 02 Y:1995 02 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,713 $2,550 Not Implemented
BD0041 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,432 $44,120 Not Implemented
BD0041 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $864 $20 Not Implemented
BD0041 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,085 $1,500 Not Implemented
BD0041 # 04 Y:1995 04 1995 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $24,032 $3,500 Not Implemented
BD0041 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,452 $5,250 Not Implemented
BD0041 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,168 $48,220 Not Implemented
WI0196 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $626 $225 Implemented
WI0196 # 01 Y:1994 01 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,341 $4,404 Not Implemented
WI0196 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,005 $3,657 Implemented
WI0196 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,512 $500 Implemented
WI0196 # 03 Y:1994 03 1994 USE PHOTOCELL CONTROLS $1,159 $675 Implemented
WI0196 # 07 Y:1994 07 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $490 $150 Not Implemented
WI0196 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $303 $500 Not Implemented
WI0196 # 12 Y:1994 12 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $109 $0 Not Implemented
WI0196 # 09 Y:1994 09 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $914 $0 Implemented