IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3564 Blowers And Fans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0347 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,058 $30,007 Not Implemented
MI0347 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,740 $2,923 Implemented
MI0347 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $5,404 $3,100 Implemented
MI0347 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,870 $12,067 Implemented
MI0347 # 06 Y:2019 06 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,152 $10,680 Not Implemented
MI0347 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,680 $2,020 Not Implemented
MI0347 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,489 $5,529 Implemented
MI0347 # 09 Y:2019 09 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,469 $1,640 Not Implemented
MI0347 # 10 Y:2019 10 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,492 $7,000 Not Implemented
MI0347 # 11 Y:2019 11 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,617 $1,707 Implemented
MI0347 # 12 Y:2019 12 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $547 $480 Implemented
MI0347 # 01 Y:2019 01 2019 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $8,536 $4,314 Not Implemented
UF0164 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,368 $16,471 Not Implemented
UF0164 # 01 Y:1996 01 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $97,999 $5,544 Not Implemented
UF0164 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,265 $3,303 Implemented
UF0164 # 04 Y:1996 04 1996 MOVE BOILER TO MORE EFFICIENT LOCATION $10,185 $0 Implemented
UF0164 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,142 $600 Implemented
UF0164 # 06 Y:1996 06 1996 AIR CONDITION ONLY SPACE NECESSARY $8,857 $880 Not Implemented
UF0164 # 07 Y:1996 07 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,240 $0 Implemented
UF0022 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $259 $869 Not Implemented
UF0022 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $2,035 $5,760 Not Implemented
UF0022 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24 $1,949 Not Implemented
UF0022 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $214 $2,840 Not Implemented
UF0022 # 05 Y:1992 05 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $57 $440 Not Implemented
UF0005 # 02 Y:1991 02 1991 KEEP LAMPS AND REFLECTORS CLEAN $2,342 $833 Not Implemented