Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1996 |
Principal Product | Filtration and Purification Devices |
NAICS | n/a |
SIC | 3564 - Blowers And Fans |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 50,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $354,606 | 7,387,163 | kWh | $0.05 |
Electricity Demand | $144,224 | 21,504 | kW-months/year | $6.71 |
LPG | $1,809 | 251 | MMBtu | $7.21 |
TOTAL ENERGY COSTS | $500,639 | |||
RECOMMENDED SAVINGS* | $145,056 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,832 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | By-product Production | Electricity Usage | Electricity Demand | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $97,999 Cost: $5,544 |
$81,573 | 1,773,154 | $16,426 | 2,448 | - | - |
$81,573 1,773,154 kWh |
$16,426 2,448 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,368 Cost: $16,471 |
$12,130 | 263,775 | $2,238 | 334 | - | - |
$12,130 263,775 kWh |
$2,238 334 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,265 Cost: $3,303 |
$1,822 | 38,101 | $443 | 66 | - | - |
$1,822 38,101 kWh |
$443 66 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION |
Savings: $10,185 Cost: - |
$10,185 | 255,862 | - | - | - | - |
$10,185 255,862 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,142 Cost: $600 |
$8,142 | 119,871 | - | - | - | - |
$8,142 119,871 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $8,857 Cost: $880 |
- | - | $8,857 | 1,320 | - | - |
- - kWh |
$8,857 1,320 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $3,240 Cost: - |
- | - | - | - | $3,240 | - |
- - kWh |
- - kW-months/year |
$3,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $145,056 Cost: $26,798 |
$113,852 | 2,450,763 | $27,964 | 4,168 | $3,240 | - | $113,852 2,450,763 kWh |
$27,964 4,168 kW-months/year |
$3,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,832 Cost: $3,903 |
$20,149 | 413,834 | $443 | 66 | $3,240 | - | $20,149 413,834 kWh |
$443 66 kW-months/year |
$3,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | By-product Production | Electricity Usage | Electricity Demand | By-product Production |