IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

175

matching recommendations
Reset
SIC 3565 Packaging Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0349 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,638 $7,500 Implemented
AS0349 # 08 Y:2003 08 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $878,532 $1,880,000 n/a
AS0349 # 09 Y:2003 09 2003 MINIMIZE WATER USAGE $3,515 $0 Implemented
AS0349 # 10 Y:2003 10 2003 MINIMIZE WATER USAGE $138 $60 Implemented
AS0349 # 11 Y:2003 11 2003 $603,884 $11,220 Not Implemented
GT0742 # 01 Y:2002 01 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,773 $1,400 Implemented
GT0742 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,487 $15,062 Implemented
GT0742 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $710 $400 Implemented
GT0742 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $248 $475 Implemented
GT0742 # 05 Y:2002 05 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $706 $0 Implemented
IA0263 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,869 $1,014 Implemented
IA0263 # 02 Y:2001 02 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,475 $0 Implemented
IA0263 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $648 $125 Not Implemented
IA0263 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $0 Not Implemented
IA0263 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $4,539 Not Implemented
IA0263 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $625 $0 Not Implemented
IA0263 # 07 Y:2001 07 2001 $84,240 $0 Implemented
IA0263 # 08 Y:2001 08 2001 $74,880 $0 Implemented
IA0165 # 01 Y:1997 01 1997 REDUCE SCRAP PRODUCTION $22,752 $48 Implemented
IA0165 # 02 Y:1997 02 1997 $12,823 $3,500 Implemented
IA0165 # 03 Y:1997 03 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,895 $4,200 Not Implemented
IA0165 # 04 Y:1997 04 1997 CONVERT TO ELECTROSTATIC POWDER COATING $3,771 $2,598 Not Implemented
IA0165 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,788 $12 Implemented
IA0165 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,421 $167 Implemented
IA0165 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,431 $1,500 Implemented