Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
175
matching recommendationsSIC | 3565 | Packaging Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0349 # 07 Y:2003 | 07 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,638 | $7,500 | Implemented |
AS0349 # 08 Y:2003 | 08 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $878,532 | $1,880,000 | n/a |
AS0349 # 09 Y:2003 | 09 | 2003 | MINIMIZE WATER USAGE | $3,515 | $0 | Implemented |
AS0349 # 10 Y:2003 | 10 | 2003 | MINIMIZE WATER USAGE | $138 | $60 | Implemented |
AS0349 # 11 Y:2003 | 11 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $603,884 | $11,220 | Not Implemented |
GT0742 # 01 Y:2002 | 01 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,773 | $1,400 | Implemented |
GT0742 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,487 | $15,062 | Implemented |
GT0742 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $710 | $400 | Implemented |
GT0742 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $248 | $475 | Implemented |
GT0742 # 05 Y:2002 | 05 | 2002 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $706 | $0 | Implemented |
IA0263 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,869 | $1,014 | Implemented |
IA0263 # 02 Y:2001 | 02 | 2001 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,475 | $0 | Implemented |
IA0263 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $648 | $125 | Not Implemented |
IA0263 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,382 | $0 | Not Implemented |
IA0263 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,744 | $4,539 | Not Implemented |
IA0263 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $625 | $0 | Not Implemented |
IA0263 # 07 Y:2001 | 07 | 2001 | MODIFY CURRENT INCENTIVE PROGRAM | $84,240 | $0 | Implemented |
IA0263 # 08 Y:2001 | 08 | 2001 | MODIFY CURRENT INCENTIVE PROGRAM | $74,880 | $0 | Implemented |
IA0165 # 01 Y:1997 | 01 | 1997 | REDUCE SCRAP PRODUCTION | $22,752 | $48 | Implemented |
IA0165 # 02 Y:1997 | 02 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $12,823 | $3,500 | Implemented |
IA0165 # 03 Y:1997 | 03 | 1997 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $9,895 | $4,200 | Not Implemented |
IA0165 # 04 Y:1997 | 04 | 1997 | CONVERT TO ELECTROSTATIC POWDER COATING | $3,771 | $2,598 | Not Implemented |
IA0165 # 05 Y:1997 | 05 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,788 | $12 | Implemented |
IA0165 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,421 | $167 | Implemented |
IA0165 # 07 Y:1997 | 07 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,431 | $1,500 | Implemented |