IAC logo
IAC Assessment: AS0349
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0349
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Juice bottling
NAICS 333993 - Packaging Machinery Manufacturing
SIC 3565 - Packaging Machinery
Sales $100,000,000-$500,000,000
# of Employees 146
Plant Area (Sq.Ft.) 380,000
Annual Production 17,000,000 Units
Production Hrs. Annual 8,640
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $770,293 12,002,128 kWh $0.06
Electricity Demand $72,456 18,829 kW-months/year $3.85
Electricity Fees $118,764 - $ -
Natural Gas $23,786 2,325 MMBtu $10.23
TOTAL ENERGY COSTS $1,099,866
RECOMMENDED SAVINGS* $1,543,103 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,102
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Administrative Changes Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ %
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$758
Cost:
$975
$758 11,049 - - - - - - - - $758
11,049
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
02: 2.7145 INSTALL SKYLIGHTS Savings:
$15,856
Cost:
$33,200
$15,856 263,822 - - - - - - - - $15,856
263,822
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,729
Cost:
$9,784
$5,648 93,980 $1,081 262 - - - - - - $5,648
93,980
kWh
$1,081
262
kW-months/year
-
-
Tgal
-
-
$
-
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,062
Cost:
$56
$5,533 92,058 $529 128 - - - - - - $5,533
92,058
kWh
$529
128
kW-months/year
-
-
Tgal
-
-
$
-
-
%
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$16,556
Cost:
$1,316
$15,378 255,878 $1,178 284 - - - - - - $15,378
255,878
kWh
$1,178
284
kW-months/year
-
-
Tgal
-
-
$
-
-
%
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,435
Cost:
$5,084
$5,758 95,810 $677 164 - - - - - - $5,758
95,810
kWh
$677
164
kW-months/year
-
-
Tgal
-
-
$
-
-
%
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,638
Cost:
$7,500
$4,157 36,216 $481 181 - - - - - - $4,157
36,216
kWh
$481
181
kW-months/year
-
-
Tgal
-
-
$
-
-
%
08: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$878,532
Cost:
$1,880,000
$990,000 11,000,000 $72,456 18,829 - - $(-183,924) - - - $990,000
11,000,000
kWh
$72,456
18,829
kW-months/year
-
-
Tgal
$(-183,924)
-
$
-
-
%
09: 3.4151 MINIMIZE WATER USAGE Savings:
$3,515
Cost:
-
- - - - $3,515 1,105,358 - - - - -
-
kWh
-
-
kW-months/year
$3,515
1,105,358
Tgal
-
-
$
-
-
%
10: 3.4151 MINIMIZE WATER USAGE Savings:
$138
Cost:
$60
- - - - $138 86,400 - - - - -
-
kWh
-
-
kW-months/year
$138
86,400
Tgal
-
-
$
-
-
%
11: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$603,884
Cost:
$11,220
- - - - - - - - $603,884 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
$603,884
-
%
TOTAL RECOMMENDED Savings:
$1,543,103
Cost:
$1,949,195
$1,043,088 11,848,813 $76,402 19,848 $3,653 1,191,758 $(-183,924) - $603,884 - $1,043,088
11,848,813
kWh
$76,402
19,848
kW-months/year
$3,653
1,191,758
Tgal
$(-183,924)
-
$
$603,884
-
%
TOTAL IMPLEMENTED Savings:
$38,102
Cost:
$14,991
$31,584 491,011 $2,865 757 $3,653 1,191,758 - - - - $31,584
491,011
kWh
$2,865
757
kW-months/year
$3,653
1,191,758
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ %
Electricity Usage Electricity Demand Water Disposal Administrative Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Administrative Changes Increase in Production