Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
175
matching recommendationsSIC | 3565 | Packaging Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0095 # 02 Y:1994 | 02 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,388 | $1,750 | Implemented |
UF0095 # 03 Y:1994 | 03 | 1994 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,867 | $24,660 | Implemented |
UF0095 # 04 Y:1994 | 04 | 1994 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,763 | $22,550 | Not Implemented |
UF0095 # 05 Y:1994 | 05 | 1994 | REPLACE ELECTRIC REHEAT WITH HEAT PIPES | $11,259 | $38,450 | Not Implemented |
UF0095 # 06 Y:1994 | 06 | 1994 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $49,423 | $76,330 | Not Implemented |
UF0095 # 07 Y:1994 | 07 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $554 | $794 | Implemented |
GT0450 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,780 | $22,892 | Not Implemented |
GT0450 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $269 | $143 | Not Implemented |
GT0450 # 03 Y:1991 | 03 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $753 | $300 | Not Implemented |
GT0450 # 04 Y:1991 | 04 | 1991 | REDUCE EXCESS STEAM BLEEDING | $2,230 | $0 | Not Implemented |
GT0450 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $647 | $0 | Not Implemented |
GT0450 # 06 Y:1991 | 06 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $641 | $500 | Not Implemented |
WI0119 # 01 Y:1991 | 01 | 1991 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,106 | $500 | Implemented |
WI0119 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,961 | $0 | Implemented |
WI0119 # 03 Y:1991 | 03 | 1991 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,287 | $0 | Implemented |
WI0119 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $735 | $1,355 | Implemented |
WI0119 # 05 Y:1991 | 05 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $430 | $1,280 | Implemented |
WI0119 # 06 Y:1991 | 06 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $469 | $0 | Implemented |
WI0119 # 07 Y:1991 | 07 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $321 | $200 | Implemented |
GT0265 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,922 | $500 | Implemented |
GT0265 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $932 | $1,249 | Implemented |
GT0265 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $257 | $300 | Not Implemented |
GT0265 # 04 Y:1985 | 04 | 1985 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $965 | $8,000 | Not Implemented |
GT0265 # 05 Y:1985 | 05 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $77 | $480 | Implemented |
GT0265 # 06 Y:1985 | 06 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,080 | $15,000 | Not Implemented |