IAC Assessment: WI0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product PACKAGING MACHINERY
NAICS n/a
SIC 3565 - Packaging Machinery
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 120 Pieces
Production Hrs. Annual 4,125
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,176 1,773,740 kWh $0.07
Natural Gas $23,498 4,209 MMBtu $5.58
TOTAL ENERGY COSTS $147,674
RECOMMENDED SAVINGS* $13,309 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,309
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$4,106
Cost:
$500
- - $4,106 - - - -
-
kWh
$4,106
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,961
Cost:
-
- - $5,524 - $(-1,563) - -
-
kWh
$5,524
-
MMBtu
$(-1,563)
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,287
Cost:
-
- - $3,287 589 - - -
-
kWh
$3,287
589
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$735
Cost:
$1,355
$735 10,551 - - - - $735
10,551
kWh
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$430
Cost:
$1,280
$430 6,155 - - - - $430
6,155
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$469
Cost:
-
$469 6,741 - - - - $469
6,741
kWh
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$321
Cost:
$200
- - $321 58 - - -
-
kWh
$321
58
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,309
Cost:
$3,335
$1,634 23,447 $13,238 647 $(-1,563) - $1,634
23,447
kWh
$13,238
647
MMBtu
$(-1,563)
-
$
TOTAL IMPLEMENTED Savings:
$13,309
Cost:
$3,335
$1,634 23,447 $13,238 647 $(-1,563) - $1,634
23,447
kWh
$13,238
647
MMBtu
$(-1,563)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes