IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
Reset
SIC 3566 Speed Changers, Drives, And Gears
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0518 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,334 $1,000 Implemented
TN0518 # 02 Y:1994 02 1994 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $10,859 $13,300 Not Implemented
TN0518 # 03 Y:1994 03 1994 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $11,508 $5,200 Not Implemented
TN0518 # 04 Y:1994 04 1994 INSTALL TIMERS AND/OR THERMOSTATS $7,597 $5,400 Not Implemented
TN0518 # 05 Y:1994 05 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,005 $360 Not Implemented
TN0518 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $6,176 $605 Not Implemented
TN0518 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,013 $200 Implemented
TN0518 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $108 Implemented
WI0112 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $153 Implemented
WI0112 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $712 $0 Implemented
WI0112 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $692 $640 Implemented
WI0112 # 04 Y:1991 04 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $604 $0 Implemented
WI0112 # 05 Y:1991 05 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $586 $0 Implemented
WI0112 # 06 Y:1991 06 1991 INSTALL STORM WINDOWS AND DOORS $321 $812 Implemented
WI0112 # 07 Y:1991 07 1991 INSTALL TIMERS AND/OR THERMOSTATS $263 $200 Implemented
WI0112 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $180 $200 Implemented
WI0112 # 09 Y:1991 09 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $132 $300 Implemented
WI0112 # 10 Y:1991 10 1991 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $73 $0 Implemented
UD0314 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,571 $25,000 Implemented
UD0314 # 02 Y:1990 02 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,218 $14,000 Implemented
UD0314 # 03 Y:1990 03 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,489 $8,000 Implemented
UD0314 # 04 Y:1990 04 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,341 $6,000 Not Implemented
UD0314 # 05 Y:1990 05 1990 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $7,638 $0 Not Implemented
UD0314 # 06 Y:1990 06 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,450 $500 Not Implemented
UD0314 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,223 $33,000 Implemented