Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
261
matching recommendationsSIC | 3566 | Speed Changers, Drives, And Gears |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0518 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,334 | $1,000 | Implemented |
TN0518 # 02 Y:1994 | 02 | 1994 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,859 | $13,300 | Not Implemented |
TN0518 # 03 Y:1994 | 03 | 1994 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $11,508 | $5,200 | Not Implemented |
TN0518 # 04 Y:1994 | 04 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $7,597 | $5,400 | Not Implemented |
TN0518 # 05 Y:1994 | 05 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,005 | $360 | Not Implemented |
TN0518 # 06 Y:1994 | 06 | 1994 | INSULATE BARE EQUIPMENT | $6,176 | $605 | Not Implemented |
TN0518 # 07 Y:1994 | 07 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,013 | $200 | Implemented |
TN0518 # 08 Y:1994 | 08 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $98 | $108 | Implemented |
WI0112 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,926 | $153 | Implemented |
WI0112 # 02 Y:1991 | 02 | 1991 | IMPROVE LUBRICATION PRACTICES | $712 | $0 | Implemented |
WI0112 # 03 Y:1991 | 03 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $692 | $640 | Implemented |
WI0112 # 04 Y:1991 | 04 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $604 | $0 | Implemented |
WI0112 # 05 Y:1991 | 05 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $586 | $0 | Implemented |
WI0112 # 06 Y:1991 | 06 | 1991 | INSTALL STORM WINDOWS AND DOORS | $321 | $812 | Implemented |
WI0112 # 07 Y:1991 | 07 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $263 | $200 | Implemented |
WI0112 # 08 Y:1991 | 08 | 1991 | INSTALL SET-BACK TIMERS | $180 | $200 | Implemented |
WI0112 # 09 Y:1991 | 09 | 1991 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $132 | $300 | Implemented |
WI0112 # 10 Y:1991 | 10 | 1991 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $73 | $0 | Implemented |
UD0314 # 01 Y:1990 | 01 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,571 | $25,000 | Implemented |
UD0314 # 02 Y:1990 | 02 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,218 | $14,000 | Implemented |
UD0314 # 03 Y:1990 | 03 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,489 | $8,000 | Implemented |
UD0314 # 04 Y:1990 | 04 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,341 | $6,000 | Not Implemented |
UD0314 # 05 Y:1990 | 05 | 1990 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $7,638 | $0 | Not Implemented |
UD0314 # 06 Y:1990 | 06 | 1990 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,450 | $500 | Not Implemented |
UD0314 # 07 Y:1990 | 07 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,223 | $33,000 | Implemented |