IAC Assessment: UD0314
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0314
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1990
Principal Product STEEL ROLLERS
NAICS n/a
SIC 3566 - Speed Changers, Drives, And Gears
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 0
Annual Production 7,500 Tons
Production Hrs. Annual 6,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $590,338 12,894,490 kWh $0.05
Natural Gas $259,979 86,833 MMBtu $2.99
TOTAL ENERGY COSTS $850,317
RECOMMENDED SAVINGS* $154,321 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $120,912
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,571
Cost:
$25,000
$17,032 283,705 $(-2,461) (-774) - - $17,032
283,705
kWh
$(-2,461)
(-774)
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$11,218
Cost:
$14,000
$12,372 141,852 $(-1,154) (-363) - - $12,372
141,852
kWh
$(-1,154)
(-363)
MMBtu
-
-
$
03: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$3,489
Cost:
$8,000
- - $3,489 1,097 - - -
-
kWh
$3,489
1,097
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,341
Cost:
$6,000
$7,341 256,155 - - - - $7,341
256,155
kWh
-
-
MMBtu
-
-
$
05: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$7,638
Cost:
-
$7,638 - - - - - $7,638
-
kWh
-
-
MMBtu
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$16,450
Cost:
$500
$16,450 - - - - - $16,450
-
kWh
-
-
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,223
Cost:
$33,000
$13,650 300,117 $(-5,427) (-1,706) - - $13,650
300,117
kWh
$(-5,427)
(-1,706)
MMBtu
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$83,411
Cost:
$150,000
$111,500 1,000,293 $(-18,089) (-5,688) $(-10,000) - $111,500
1,000,293
kWh
$(-18,089)
(-5,688)
MMBtu
$(-10,000)
-
$
09: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$1,980
Cost:
-
$1,980 89,977 - - - - $1,980
89,977
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$154,321
Cost:
$236,500
$187,963 2,072,099 $(-23,642) (-7,434) $(-10,000) - $187,963
2,072,099
kWh
$(-23,642)
(-7,434)
MMBtu
$(-10,000)
-
$
TOTAL IMPLEMENTED Savings:
$120,912
Cost:
$230,000
$154,554 1,725,967 $(-23,642) (-7,434) $(-10,000) - $154,554
1,725,967
kWh
$(-23,642)
(-7,434)
MMBtu
$(-10,000)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes