Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
179
matching recommendationsSIC | 3567 | Industrial Furnaces And Ovens |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2315 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $75 | n/a |
UC2315 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $323 | $855 | n/a |
UC2315 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,868 | $11,165 | n/a |
UC2315 # 02 Y:2023 | 02 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $354 | $222 | n/a |
UC2315 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $269 | $0 | n/a |
UC2315 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,189 | $268,543 | n/a |
UC2315 # 13 Y:2023 | 13 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $10,809 | $60,198 | n/a |
UC2315 # 12 Y:2023 | 12 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $9,576 | $41,370 | n/a |
UC2315 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,231 | $150 | n/a |
UC2315 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,770 | $559 | n/a |
UC2315 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,601 | $25,290 | n/a |
UC2315 # 09 Y:2023 | 09 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $5,665 | $31,002 | n/a |
UC2315 # 10 Y:2023 | 10 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $3,746 | $34,025 | n/a |
TT0295 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $646 | $2,610 | Not Implemented |
TT0295 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,010 | $1,360 | Not Implemented |
TT0295 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,897 | $44,225 | Not Implemented |
TT0295 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,115 | $20,000 | Not Implemented |
TT0295 # 06 Y:2023 | 06 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $377 | $150 | Not Implemented |
TT0295 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,448 | $2,000 | Not Implemented |
UU0220 # 01 Y:2023 | 01 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $67,069 | $0 | Implemented |
UU0220 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,986 | $13,500 | Implemented |
UU0220 # 03 Y:2023 | 03 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,450 | $3,366 | Not Implemented |
UU0220 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,245 | $3,810 | Not Implemented |
UU0220 # 05 Y:2023 | 05 | 2023 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,160 | $50 | Implemented |
UU0220 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $920 | $1,200 | Implemented |