Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17
matching recommendationsSIC | 3567 | Industrial Furnaces And Ovens |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0127 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,628 | $4,080 | Implemented |
WV0127 # 10 Y:1997 | 10 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $85,710 | $80,000 | Not Implemented |
WV0127 # 09 Y:1997 | 09 | 1997 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,040 | $200 | Not Implemented |
WV0127 # 08 Y:1997 | 08 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $538 | $188 | Not Implemented |
WV0127 # 07 Y:1997 | 07 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $96,588 | $16,000 | Not Implemented |
WV0127 # 06 Y:1997 | 06 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,192 | $0 | Not Implemented |
WV0127 # 05 Y:1997 | 05 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $19,644 | $12,500 | Not Implemented |
WV0127 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $391 | $200 | Implemented |
WV0127 # 03 Y:1997 | 03 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $243 | $480 | Implemented |
WV0127 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $718 | $807 | Implemented |
WV0045 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $530 | $740 | Implemented |
WV0045 # 07 Y:1994 | 07 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $1,511 | $900 | Implemented |
WV0045 # 06 Y:1994 | 06 | 1994 | USE SYNTHETIC LUBRICANT | $156 | $0 | Not Implemented |
WV0045 # 05 Y:1994 | 05 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $960 | $18 | Implemented |
WV0045 # 04 Y:1994 | 04 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,270 | $960 | Implemented |
WV0045 # 03 Y:1994 | 03 | 1994 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,030 | $4,400 | Not Implemented |
WV0045 # 02 Y:1994 | 02 | 1994 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,284 | $960 | Not Implemented |