IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3568 Power Transmission Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0067 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,416 $0 Implemented
WM0067 # 14 Y:2015 14 2015 INSTALL OCCUPANCY SENSORS $731 $1,876 Not Implemented
WM0067 # 13 Y:2015 13 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,678 $0 Implemented
WM0067 # 12 Y:2015 12 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,737 $0 Not Implemented
WM0067 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,495 $10,871 Implemented
WM0067 # 10 Y:2015 10 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,592 $640 Implemented
WM0067 # 09 Y:2015 09 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,111 $1,245 Not Implemented
WM0067 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,586 $1,680 Implemented
WM0067 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $9,191 $1,600 Not Implemented
WM0067 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $7,737 $654 Not Implemented
WM0067 # 05 Y:2015 05 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,203 $7,680 Not Implemented
WM0067 # 03 Y:2015 03 2015 COMBINE UTILITY METERS $35,185 $4,450 Not Implemented
WM0067 # 02 Y:2015 02 2015 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $44,425 $42,690 Not Implemented
WM0067 # 01 Y:2015 01 2015 USE MAGNETIC TECHNOLOGY TO TREAT WATER $7,657 $15,000 Not Implemented
WI0017 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $230 $0 Implemented
WI0017 # 07 Y:1988 07 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,381 $3,000 Not Implemented
WI0017 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $371 $500 Implemented
WI0017 # 05 Y:1988 05 1988 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $10,059 $0 Not Implemented
WI0017 # 04 Y:1988 04 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,290 $1,500 Not Implemented
WI0017 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,124 $2,325 Implemented
WI0017 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $336 $956 Implemented