IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 3572 Computer Storage Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0408 # 05 Y:1998 05 1998 ELIMINATE/REDUCE AN OPERATION $520 $80 Implemented
CO0408 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $273 $482 Implemented
CO0340 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $130 Implemented
CO0340 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,090 $3,670 Implemented
CO0340 # 02 Y:1995 02 1995 AIR CONDITION ONLY SPACE NECESSARY $3,580 $400 Implemented
CO0340 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,040 $1,990 Implemented
CO0252 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,975 $3,080 Implemented
CO0252 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $450 $1,380 Implemented
CO0252 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,050 $3,890 Implemented
CO0252 # 06 Y:1992 06 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,300 $6,000 Implemented
CO0252 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,060 $410 Implemented
CO0252 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,550 $4,910 Implemented
CO0252 # 02 Y:1992 02 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $23,560 $9,330 Implemented
CO0252 # 01 Y:1992 01 1992 REDUCE VENTILATION AIR $580 $50 Implemented
CO0137 # 01 Y:1988 01 1988 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,200 $500 Implemented
CO0137 # 06 Y:1988 06 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,725 $4,000 Implemented
CO0137 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $65 $200 Implemented
CO0137 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $257 $500 Implemented
CO0137 # 02 Y:1988 02 1988 OPTIMIZE PLANT POWER FACTOR $4,000 $5,850 Implemented