IAC logo
IAC Assessment: CO0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1988
Principal Product OPTICAL STORAGE DISK
NAICS n/a
SIC 3572 - Computer Storage Devices
Sales $10,000,000-$50,000,000
# of Employees 280
Plant Area (Sq.Ft.) 0
Annual Production 2,000 Pieces
Production Hrs. Annual 5,616
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,598 3,983,880 kWh $0.04
Natural Gas $4,627 1,122 MMBtu $4.12
TOTAL ENERGY COSTS $180,225
RECOMMENDED SAVINGS* $15,154 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,247
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,200
Cost:
$500
$1,200 11,430 - - $1,200
11,430
kWh
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,000
Cost:
$5,850
$4,000 - - - $4,000
-
kWh
-
-
MMBtu
03: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$6,070
Cost:
$19,800
$6,070 137,749 - - $6,070
137,749
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$257
Cost:
$500
$152 3,517 $105 26 $152
3,517
kWh
$105
26
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$65
Cost:
$200
$65 1,465 - - $65
1,465
kWh
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,725
Cost:
$4,000
$2,725 61,841 - - $2,725
61,841
kWh
-
-
MMBtu
07: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$427
Cost:
$370
$157 3,517 $270 66 $157
3,517
kWh
$270
66
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$410
Cost:
$800
$410 9,379 - - $410
9,379
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,154
Cost:
$32,020
$14,779 228,898 $375 92 $14,779
228,898
kWh
$375
92
MMBtu
TOTAL IMPLEMENTED Savings:
$8,247
Cost:
$11,050
$8,142 78,253 $105 26 $8,142
78,253
kWh
$105
26
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas