IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,655

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0417 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,687 $1,868 Not Implemented
LE0417 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,602 $25,000 Implemented
LE0417 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,120 $22,015 Implemented
LE0417 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,659 $62,300 Implemented
IP0058 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,007 $326 Not Implemented
IP0058 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $256 $51 Not Implemented
IP0058 # 03 Y:2016 03 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $30,281 $6,819 Not Implemented
IP0058 # 04 Y:2016 04 2016 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $11,137 $4,626 Not Implemented
IP0058 # 05 Y:2016 05 2016 USE MAGNETIC TECHNOLOGY TO TREAT WATER $227 $255 Not Implemented
IP0058 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $46,574 $102,745 Not Implemented
UD0942 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,296 $50 Not Implemented
UD0942 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $245 $35 Not Implemented
UD0942 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,012 $810 Not Implemented
UD0942 # 04 Y:2016 04 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,967 $4,500 Not Implemented
UD0942 # 05 Y:2016 05 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,803 $9,350 Not Implemented
UD0942 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $7,691 $28,200 Not Implemented
UD0942 # 07 Y:2016 07 2016 REDUCE VENTILATION AIR $1,533 $0 Not Implemented
UD0942 # 08 Y:2016 08 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,368 $0 Not Implemented
MZ0208 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $79 $200 Not Implemented
MZ0208 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,161 $6,600 Implemented
MZ0208 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $3,247 $1,250 Implemented
MZ0208 # 04 Y:2016 04 2016 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $118,110 $525,000 Implemented
NC0548 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $23,830 $85,000 Not Implemented
NC0548 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,922 $5,000 Not Implemented
NC0548 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,958 $6,100 Implemented