Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsSIC | 358 | Refrigeration And Service Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0446 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $982 | $950 | Not Implemented |
AS0446 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,288 | $1,482 | Not Implemented |
AS0446 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,695 | $180 | Implemented |
AS0414 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $17,731 | $200 | Implemented |
AS0414 # 02 Y:2006 | 02 | 2006 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $28,518 | $20,000 | Implemented |
AS0414 # 01 Y:2006 | 01 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $813,934 | $3,030,000 | Not Implemented |
AS0410 # 02 Y:2005 | 02 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,150 | $6,600 | Not Implemented |
AS0410 # 01 Y:2005 | 01 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $7,503 | $6,000 | Not Implemented |
AS0410 # 08 Y:2005 | 08 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $103 | $689 | Not Implemented |
AS0410 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,623 | $100 | Implemented |
AS0410 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $0 | $5,538 | Implemented |
AS0410 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,056 | $1,000 | Implemented |
AS0410 # 06 Y:2005 | 06 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,603 | $7,200 | Not Implemented |
AS0410 # 07 Y:2005 | 07 | 2005 | USE SOLAR HEAT TO HEAT WATER | $591 | $3,200 | Not Implemented |
AS0393 # 08 Y:2005 | 08 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $968 | $3,000 | Implemented |
AS0393 # 10 Y:2005 | 10 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $108 | $224 | Implemented |
AS0393 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $55,760 | $2,000 | Not Implemented |
AS0393 # 05 Y:2005 | 05 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,250 | $12,278 | Implemented |
AS0393 # 02 Y:2005 | 02 | 2005 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $29,744 | $15,000 | Not Implemented |
AS0393 # 07 Y:2005 | 07 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,152 | $1,260 | Implemented |
AS0393 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $324 | $350 | Not Implemented |
AS0393 # 04 Y:2005 | 04 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,674 | $5,500 | Not Implemented |
AS0393 # 06 Y:2005 | 06 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,527 | $70 | Implemented |
AS0393 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,557 | $210 | Implemented |
AS0271 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $403 | $60 | Not Implemented |