IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 3585 Refrigeration And Heating Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0237 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $760 Implemented
TT0237 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,896 $10 Implemented
TT0237 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,445 $0 Implemented
TT0237 # 07 Y:2020 07 2020 METER WASTE WATER $6,876 $2,000 Implemented
TT0237 # 05 Y:2020 05 2020 INSTALL TIMERS AND/OR THERMOSTATS $11,220 $20 Implemented
TT0237 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,403 $33,173 Implemented
TT0237 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,248 $3,360 Implemented
OK0692 # 06 Y:2004 06 2004 INSTALL SET-BACK TIMERS $81,447 $10,000 Implemented
OK0692 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,577 $11,882 Implemented
OK0692 # 07 Y:2004 07 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,800 $0 Implemented
OK0692 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,221 $8,625 Implemented
OK0692 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,239 $2,275 Implemented
AR0156 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $564 $170 Implemented
AR0156 # 04 Y:1999 04 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $82 $0 Implemented
AR0130 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,683 $730 Implemented
AR0130 # 09 Y:1997 09 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,478 $1,800 Implemented
AR0130 # 08 Y:1997 08 1997 INSTALL MAGAZINES FOR TEMPORARY STORAGE $1,980 $2,400 Implemented
AR0130 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,328 $0 Implemented
AR0130 # 05 Y:1997 05 1997 DISCONNECT BALLASTS $1,409 $1,409 Implemented
AR0130 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $1,260 Implemented