Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2004 |
Principal Product | Air Conditioning Units |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $100,000,000-$500,000,000 |
# of Employees | 1,300 |
Plant Area (Sq.Ft.) | 1,000,000 |
Annual Production | 345,000 Pieces |
Production Hrs. Annual | 5,304 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $818,311 | 27,722,213 | kWh | $0.03 |
Electricity Demand | $250,793 | 62,108 | kW-months/year | $4.04 |
Electricity Fees | $3,345 | - | $ | - |
Natural Gas | $462,161 | 84,191 | MMBtu | $5.49 |
TOTAL ENERGY COSTS | $1,575,527 | |||
RECOMMENDED SAVINGS* | $820,368 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $120,284 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $24,239 Cost: $2,275 |
$19,201 | 650,880 | $5,913 | 123 | - | - | $(-875) | - | - | - |
$19,201 650,880 kWh |
$5,913 123 kW-months/year |
- - MMBtu |
$(-875) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $11,206 Cost: $10,250 |
$11,206 | 379,851 | - | - | - | - | - | - | - | - |
$11,206 379,851 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $5,114 Cost: $7,875 |
$3,912 | 132,600 | $1,202 | 25 | - | - | - | - | - | - |
$3,912 132,600 kWh |
$1,202 25 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,221 Cost: $8,625 |
$1,221 | 41,391 | - | - | - | - | - | - | - | - |
$1,221 41,391 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $1,389 Cost: $6,675 |
- | - | $1,389 | 55 | - | - | - | - | - | - |
- - kWh |
$1,389 55 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $81,447 Cost: $10,000 |
- | - | - | - | $81,447 | 14,383 | - | - | - | - |
- - kWh |
- - kW-months/year |
$81,447 14,383 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $8,800 Cost: - |
- | - | - | - | - | - | $8,800 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,800 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $17,464 Cost: $5,050 |
$17,464 | 591,993 | - | - | - | - | - | - | - | - |
$17,464 591,993 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $663,000 Cost: $130,000 |
- | - | - | - | - | - | $663,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$663,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,577 Cost: $11,882 |
$2,204 | 74,722 | $1,634 | 34 | - | - | - | - | $739 | - |
$2,204 74,722 kWh |
$1,634 34 kW-months/year |
- - MMBtu |
- - $ |
$739 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,911 Cost: $1,690 |
$1,911 | 64,795 | - | - | - | - | - | - | - | - |
$1,911 64,795 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $820,368 Cost: $194,322 |
$57,119 | 1,936,232 | $10,138 | 237 | $81,447 | 14,383 | $670,925 | - | $739 | - | $57,119 1,936,232 kWh |
$10,138 237 kW-months/year |
$81,447 14,383 MMBtu |
$670,925 - $ |
$739 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $120,284 Cost: $32,782 |
$22,626 | 766,993 | $7,547 | 157 | $81,447 | 14,383 | $7,925 | - | $739 | - | $22,626 766,993 kWh |
$7,547 157 kW-months/year |
$81,447 14,383 MMBtu |
$7,925 - $ |
$739 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |