Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
967
matching recommendationsSIC | 3585 | Refrigeration And Heating Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0444 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $1,624 | $2,466 | n/a |
MS0444 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $99,224 | $613,200 | n/a |
MS0444 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,814 | $400 | n/a |
MS0444 # 04 Y:2025 | 04 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $52,643 | $67,500 | n/a |
GT0995 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,089 | $200 | n/a |
GT0995 # 02 Y:2025 | 02 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $385 | $90 | n/a |
GT0995 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,796 | $500 | n/a |
GT0995 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $746 | $567 | n/a |
GT0995 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,769 | $1,850 | n/a |
GT0995 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $432 | $200 | n/a |
GT0995 # 05 Y:2025 | 05 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $469 | $313 | n/a |
GT0995 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,545 | $269,534 | n/a |
MI0449 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,015 | $1,980 | n/a |
MI0449 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,413 | $3,096 | n/a |
MI0449 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,646 | $700 | n/a |
MI0449 # 06 Y:2024 | 06 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,254 | $320 | n/a |
MI0449 # 07 Y:2024 | 07 | 2024 | METER WASTE WATER | $1,195 | $900 | n/a |
MI0449 # 02 Y:2024 | 02 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $15,070 | $13,480 | n/a |
MI0449 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,976 | $61,998 | n/a |
OK1116 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $151,456 | $1,065,000 | Not Implemented |
OK1116 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,007 | $7,840 | Not Implemented |
OK1116 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,536 | $0 | Implemented |
OK1116 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $17,160 | $7,800 | Implemented |
OK1116 # 03 Y:2024 | 03 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $3,039 | $2,670 | Not Implemented |
OK1116 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $38,052 | $31,569 | Implemented |