IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3585 Refrigeration And Heating Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0473 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $105 Implemented
IA0473 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $4,669 Implemented
IA0473 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,472 $426 Not Implemented
IA0473 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $615 $1,273 Implemented
IA0473 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $954 Not Implemented
IA0473 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $695 $1,100 Not Implemented
MS0382 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,709 $17,527 Implemented
MS0382 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,936 $1,056 Not Implemented
MS0382 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,932 $480 Implemented
MS0382 # 03 Y:2011 03 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $14,805 $0 Implemented
MS0382 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,473 $142 Implemented
MS0382 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,988 $223,560 Not Implemented
MS0381 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,037 $8,580 Implemented
MS0381 # 05 Y:2011 05 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,990 $12,600 Implemented
MS0381 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,709 $57,080 Not Implemented
MS0381 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $264 $317 Not Implemented
MS0381 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,659 $34,108 Not Implemented
MS0381 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $293 Implemented
TT0074 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,855 $61,400 Implemented
TT0074 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,100 $5,000 Implemented
TT0074 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $48,800 $37,500 Implemented
TT0074 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,250 $7,500 Not Implemented
TT0074 # 05 Y:2011 05 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $52,200 $95,100 Not Implemented
TT0074 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,100 $12,000 Not Implemented
TT0074 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $10,300 $21,000 Not Implemented