IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

429

matching recommendations
Reset
SIC 3589 Service Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0191 # 04 Y:1986 04 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $221 $0 Implemented
KU0191 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $525 $0 Implemented
KU0191 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $151 $138 Not Implemented
CO0027 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,811 $219 Implemented
CO0027 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $150 Implemented
CO0027 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $168 $100 Implemented
CO0027 # 04 Y:1985 04 1985 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $698 $200 Implemented
CO0027 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $843 $1,200 Not Implemented
CO0027 # 06 Y:1985 06 1985 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,928 $750 Implemented
UD0084 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,160 $1,527 Not Implemented
UD0084 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,999 $1,500 Not Implemented
UD0084 # 03 Y:1983 03 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,060 $1,000 Not Implemented
UD0084 # 04 Y:1983 04 1983 INSTALL STORM WINDOWS AND DOORS $4,907 $6,932 Not Implemented
UD0084 # 05 Y:1983 05 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,800 $8,000 Not Implemented
KU0041 # 01 Y:1982 01 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,933 $0 Not Implemented
KU0041 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $7,500 Implemented
KU0041 # 03 Y:1982 03 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,027 $287 Not Implemented
KU0041 # 04 Y:1982 04 1982 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $738 $1,800 Not Implemented
KU0041 # 05 Y:1982 05 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,547 $0 Not Implemented
KU0041 # 06 Y:1982 06 1982 RECOVER WASTE HEAT FROM EQUIPMENT $1,134 $800 Not Implemented
TN0112 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $594 $600 Not Implemented
TN0112 # 02 Y:1982 02 1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,363 $305 Not Implemented
TN0112 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,164 $8,376 Not Implemented
KU0016 # 01 Y:1981 01 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $497 $1,471 Not Implemented
KU0016 # 02 Y:1981 02 1981 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $748 $928 Implemented