IAC logo
IAC Assessment: UD0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1983
Principal Product WATER SOFTNERS
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,470
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,563 1,020,809 kWh $0.06
Natural Gas $32,583 7,278 MMBtu $4.48
TOTAL ENERGY COSTS $97,146
RECOMMENDED SAVINGS* $13,926 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,160
Cost:
$1,527
$3,465 47,479 $(-305) (-61) $3,465
47,479
kWh
$(-305)
(-61)
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,999
Cost:
$1,500
$2,095 11,137 $(-96) (-19) $2,095
11,137
kWh
$(-96)
(-19)
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,060
Cost:
$1,000
$1,629 19,930 $(-569) (-114) $1,629
19,930
kWh
$(-569)
(-114)
MMBtu
04: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$4,907
Cost:
$6,932
- - $4,907 981 -
-
kWh
$4,907
981
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,800
Cost:
$8,000
- - $2,800 560 -
-
kWh
$2,800
560
MMBtu
TOTAL RECOMMENDED Savings:
$13,926
Cost:
$18,959
$7,189 78,546 $6,737 1,347 $7,189
78,546
kWh
$6,737
1,347
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu