Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
318
matching recommendationsSIC | 3589 | Service Industry Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0414 # 01 Y:2006 | 01 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $813,934 | $3,030,000 | Not Implemented |
AS0414 # 02 Y:2006 | 02 | 2006 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $28,518 | $20,000 | Implemented |
AS0414 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $17,731 | $200 | Implemented |
UM0269 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,834 | $1,275 | Not Implemented |
UM0269 # 04 Y:2004 | 04 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,128 | $3,000 | Not Implemented |
UM0269 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,913 | $2,890 | Not Implemented |
UM0269 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,435 | $2,000 | Not Implemented |
UM0269 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $220 | $276 | Not Implemented |
UM0269 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,237 | $600 | Not Implemented |
UM0269 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,285 | $400 | Not Implemented |
BD0264 # 15 Y:2004 | 15 | 2004 | USE POWER DURING OFF-PEAK PERIODS | $1,019 | $1,300 | Not Implemented |
BD0264 # 01 Y:2004 | 01 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $7,724 | $2,816 | Not Implemented |
BD0264 # 02 Y:2004 | 02 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,965 | $200 | Implemented |
BD0264 # 04 Y:2004 | 04 | 2004 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $2,232 | $3,600 | Implemented |
BD0264 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,433 | $60 | Implemented |
BD0264 # 05 Y:2004 | 05 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,766 | $1,550 | Not Implemented |
BD0264 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $282 | $600 | Implemented |
BD0264 # 14 Y:2004 | 14 | 2004 | PURCHASE APPROPRIATELY SIZED MATERIAL | $2,550 | $500 | Implemented |
BD0264 # 13 Y:2004 | 13 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $2,800 | $432 | Implemented |
BD0264 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $439 | $850 | Not Implemented |
BD0264 # 11 Y:2004 | 11 | 2004 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $3,760 | $2,200 | Implemented |
BD0264 # 12 Y:2004 | 12 | 2004 | AUTOMATE PAYROLL SYSTEM | $2,500 | $3,000 | Implemented |
BD0264 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $387 | $550 | Not Implemented |
BD0264 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $353 | $345 | Implemented |
BD0264 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $547 | $182 | Implemented |