IAC logo
IAC Assessment: BD0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2004
Principal Product Vacuum Sewage Systems
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3589 - Service Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 54,500
Annual Production 50,000 Pieces
Production Hrs. Annual 3,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,616 547,200 kWh $0.03
Electricity Demand $27,333 2,195 kW-months/year $12.45
Natural Gas $15,538 20,269 MMBtu $0.77
TOTAL ENERGY COSTS $60,690
RECOMMENDED SAVINGS* $31,757 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,422
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $ $ $
01: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$7,724
Cost:
$2,816
$4,468 190,920 $3,256 262 - - - - - - - - - - - - - - $4,468
190,920
kWh
$3,256
262
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,965
Cost:
$200
$948 40,500 $2,017 162 - - - - - - - - - - - - - - $948
40,500
kWh
$2,017
162
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,433
Cost:
$60
$1,407 60,121 $1,026 82 - - - - - - - - - - - - - - $1,407
60,121
kWh
$1,026
82
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.2533 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS Savings:
$2,232
Cost:
$3,600
- - - - $2,232 279 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,232
279
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,766
Cost:
$1,550
$758 32,400 $1,008 81 - - - - - - - - - - - - - - $758
32,400
kWh
$1,008
81
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$547
Cost:
$182
$95 4,056 $194 16 - - - - $141 - - - $117 - - - - - $95
4,056
kWh
$194
16
kW-months/year
-
-
MMBtu
-
-
lb
$141
-
$
-
-
$
$117
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$439
Cost:
$850
$141 6,000 $298 24 - - - - - - - - - - - - - - $141
6,000
kWh
$298
24
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$387
Cost:
$550
$124 5,280 $263 21 - - - - - - - - - - - - - - $124
5,280
kWh
$263
21
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$353
Cost:
$345
$101 4,327 $73 6 - - - - $75 - - - $104 - - - - - $101
4,327
kWh
$73
6
kW-months/year
-
-
MMBtu
-
-
lb
$75
-
$
-
-
$
$104
-
$
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$282
Cost:
$600
$83 3,550 $199 16 - - - - - - - - - - - - - - $83
3,550
kWh
$199
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
11: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$3,760
Cost:
$2,200
- - - - - - $3,760 47 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,760
47
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
12: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$2,500
Cost:
$3,000
- - - - - - - - - - $2,500 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,500
-
$
-
-
$
-
-
$
-
-
$
13: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$2,800
Cost:
$432
- - - - - - - - - - - - - - - - $2,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
$2,800
-
$
14: 4.2140 PURCHASE APPROPRIATELY SIZED MATERIAL Savings:
$2,550
Cost:
$500
- - - - - - - - - - - - - - $2,550 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$2,550
-
$
-
-
$
15: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$1,019
Cost:
$1,300
- - $1,019 82 - - - - - - - - - - - - - - -
-
kWh
$1,019
82
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,757
Cost:
$18,185
$8,125 347,154 $9,353 751 $2,232 279 $3,760 47 $216 - $2,500 - $221 - $2,550 - $2,800 - $8,125
347,154
kWh
$9,353
751
kW-months/year
$2,232
279
MMBtu
$3,760
47
lb
$216
-
$
$2,500
-
$
$221
-
$
$2,550
-
$
$2,800
-
$
TOTAL IMPLEMENTED Savings:
$20,422
Cost:
$11,119
$2,634 112,554 $3,509 282 $2,232 279 $3,760 47 $216 - $2,500 - $221 - $2,550 - $2,800 - $2,634
112,554
kWh
$3,509
282
kW-months/year
$2,232
279
MMBtu
$3,760
47
lb
$216
-
$
$2,500
-
$
$221
-
$
$2,550
-
$
$2,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost